PackagesCanonicalsLogsProblems
    Packages
    hl7.fhir.r2b.examples@1.4.0
    http://hl7.org/fhir/v2/0472
{
  "description": "FHIR Value set/code system definition for HL7 v2 table 0472 ( TQ Conjunction ID)",
  "_filename": "CodeSystem-v2-0472.json",
  "package_name": "hl7.fhir.r2b.examples",
  "date": null,
  "versionNeeded": false,
  "meta": {
    "profile": [ "http://hl7.org/fhir/StructureDefinition/valueset-shareable-definition" ]
  },
  "publisher": "HL7, Inc",
  "content": "complete",
  "name": "v2 TQ Conjunction ID",
  "type": null,
  "experimental": "true",
  "resourceType": "CodeSystem",
  "title": null,
  "package_version": "1.4.0",
  "extension": [ {
    "url": "http://hl7.org/fhir/StructureDefinition/valueset-oid",
    "valueUri": "urn:oid:2.16.840.1.133883.18.300"
  } ],
  "compositional": false,
  "status": "active",
  "id": "c6dc46a7-21bb-4f70-a18e-46b3fb7a6871",
  "valueSet": "http://hl7.org/fhir/ValueSet/v2-0472",
  "kind": null,
  "count": 0,
  "url": "http://hl7.org/fhir/v2/0472",
  "concept": [ {
    "code": "A",
    "display": "Asynchronous",
    "extension": [ {
      "url": "http://hl7.org/fhir/StructureDefinition/valueset-comments",
      "valueString": "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time).  The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e."
    } ]
  }, {
    "code": "C",
    "display": "Actuation Time",
    "extension": [ {
      "url": "http://hl7.org/fhir/StructureDefinition/valueset-comments",
      "valueString": "It will be followed by a completion time for the service.  This code allows one to distinguish between the time and priority at which a service should be actuated (e.g. blood should be drawn) and the time and priority at which a service should be complet"
    } ]
  }, {
    "code": "S",
    "display": "Synchronous",
    "extension": [ {
      "url": "http://hl7.org/fhir/StructureDefinition/valueset-comments",
      "valueString": "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g. when a service request is"
    } ]
  } ],
  "caseSensitive": false,
  "version": "2.8.2",
  "contact": [ {
    "telecom": [ {
      "rank": 1,
      "value": "http://hl7.org",
      "system": "other"
    } ]
  } ]
}